Termite Control

     

    Have you observed any of the following lately?

  • Wood that sounds hollow when tapped.

  • A temporary swarm of winged insects in your home or from the soil around your home.

  • Mud tubes on exterior walls, wooden beams, or in crawl spaces.

These are strong indicators that point towards only one thing – termite infestation. Subterranean or Ground nesting termites are the most destructive and are mainly responsible for the damage caused in buildings. Typically they form nests or colonies under the soil near the ground level. These colonies may persist for many years and as they mature contain a population running to millions. Termite infestation is difficult to detect as they work from the inside to the outside. Termites need cellulose to survive and your belongings like wood (like furniture, boxes or even wooden flooring, doors and window frames) and paper are majorly at risk.

Pre-Construction Anti Termite Treatment

If you are planning to build a property, ie. house, factory, office etc, termite control is a must. We use highly professional and advanced techniques for treating the termite infestation problem. Direct liquid treatments are applied to the outside, inside and also in the foundation to eliminate the termites completely. Direct injection of anti termite chemical in areas like the foundation, within the foundation walls and also areas under the concrete slabs is part of our specialized termite control treatment plan.

 

    Pre-Construction Termite Treatment Stages:
  • Treatment in the trenches & surrounding RCC column.

  • Treatment in the junction of Wall & floor.

  • Treatment in the top surface of plinth filling.

  • Treatment in the external perimeter of the building.
    Post Construction Anti-Termite Treatment (For Existing Buildings)

    Treatment To Masonry Foundation (External Side)

  • If there is loose soil around the walls of your building, we dig a shovel width trench close to the external wall of the building exposing the foundation wall surface upto a depth of 50cm.

  • If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 300mm (1ft) apart from each other. Insecticide is then poured, so that it reaches the soil to eliminate the termites present there and to stop them from re-infesting. If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.

Wooden portions of the building are treated:
Further, on all floors, wood work like doors and windows, which are highly susceptible to termite attack are also protected by treatment. Spot treatment of spraying on infested areas in the walls and ceiling is also carried out.

(Warranty for 5 Years! We give a warranty of five years. Any re-infestation of termites during the warranty period is treated without any extra charge.)

Copyright © 2017 Pest Control & Co. All Rights Reserved. Site Designed & Maintained by Dreamz Interactive.